IMAX TOUCH 2D Pre Install Check list
|
|||||
Updated: 12/28/2017
Article #: 147
|
|||||
In order to eliminate confusion and ensure a successful install we have laid out a series of Pre installation protocols outlined below.
1. Site Check form - Before the system is installed we require our sitecheck form to be completed to ensure the installation site meets the proper specifications.
Site Check from includes
To coordinate a live video conference walk through of the install site with an Owandy Rep via smart phone video conference contact your manufacture rep or dealer rep to schedule.
2. Logistics - Our Logistics department will be in contact to arrange shipment once site check form has been completed, we would need to know if the system will be sent directly to the practice or to different location first for storage before the installation date
Prepping for install Network System communication: Unit communicates with PC via cat5 cable , IP scheme can be changed to match office network.
Supplies to install : Be sure to take a 110V plug with you on install, the cable does not have a plug as it is ready for hardwiring. Most of the systems bolts are Metric Allen bolts from 2mm to 8 mm. Mounting hardware for wood is not included with system , unit comes with bolts and anchors for concrete only not wood.
Training videos and service material : Unpacking rotator (no audio) : https://www.youtube.com/watch?v=ygR1Eea9anA
Mounting Rotator to Column (no audio) : https://www.youtube.com/watch?v=QnWcyxkpKdQ
Bolting Rotator to Column (with audio) :https://www.youtube.com/watch?v=Gb_MHRqK5XY&t=28s Connecting cables to CPU and DSPU : https://www.youtube.com/watch?v=KeBK-OaIkeY Links |
|||||
|
|||||
|
|||||
|